CRA, Schlumberger & Cairn: Enclosed Flaring in Barmer

17,000
m³/hr
<10%
HC
12m
Stack
The Overview
Schlumberger for Cairn India Limited (Vedanta)
Client
Upstream Production Operations
Sector
Engineering, Manufacturing, Testing, Commissioning
CRA Role
Enclosed flaring of lean and contaminated produced gas
Application
Successfully commissioned
Status
Produced gas
Inlet Gas

CRA partnered with Schlumberger to engineer and deliver an enclosed flaring system for Cairn India Limited’s upstream production operations in Barmer, Rajasthan. The system was designed to safely combust lean and contaminated produced gas with very low hydrocarbon content, ensuring stable combustion, environmental compliance, and reliable operation in a remote desert environment. The solution focused on advanced combustion design and full subsystem integration to handle challenging gas characteristics under continuous operating conditions.

The Challenge

Safely Flaring Lean, Contaminated Produced Gas with Very Low Calorific Value

Schlumberger required a flaring solution capable ofhandling produced gas streams with extremely low hydrocarbon content andcontamination, creating inherent combustion and stability challenges. Thesystem needed to address the following constraints:

• Very lean gas composition with limited calorificvalue
• Presence of contaminants requiring robust combustion containment
• Requirement for stable, enclosed combustion to meet safety and environmentalnorms
• Continuous operation in remote desert conditions at Barmer
• High reliability expectations under upstream production constraints

The flare had to ensure consistent ignition, stableflame retention, and controlled radiation while operating with a difficult andvariable gas stream.

Our Solution

Custom-Engineered Enclosed Flare with Integrated Combustion and Safety Systems

CRA engineered and manufactured a fully integratedenclosed flaring system specifically designed for lean and contaminatedproduced gas applications. The solution emphasized combustion stability,maintainability, and turnkey delivery.

Core Components Delivered

• Custom-designed enclosed flare with advanced combustion geometry
• Engineered burner optimized for lean gas combustion
• Pilot and Flame Front Generator ignition system
• Dedicated air blower for controlled combustion air management
• Fully integrated piping, instrumentation, and control systems
• Skid-mounted enclosure and structural framework

Engineering and Validation

• Detailed structural design and layout engineering
• FEA simulations to validate mechanical integrity
• Radiation and noise analysis to ensure site compliance
• Electrical engineering and interlock logic for safe operation
• Maintenance-focused design provisions for long-term reliability

Fabrication, Testing, and Commissioning

• Complete in-house fabrication of all mechanicaland combustion components
• Factory testing of ignition, airflow, and control logic
• Fully skid-mounted delivery for rapid installation
• On-site commissioning and performance validation at Barmer

Results

Reliable Enclosed Flaring for Challenging Produced Gas Streams

• Stable combustion achieved for lean gas withhydrocarbon content below 10%
• Safe and controlled enclosed flaring of contaminated produced gas
• Reliable ignition and flame stability under continuous operation
• Compliance with safety, radiation, and noise requirements
• Seamless integration into Cairn’s upstream production facilities
• Demonstrated performance in a remote desert operating environment

Conclusion

CRA Demonstrates Proven Capability in Complex Gas Flaring

This project highlights CRA’s capability toengineer and deliver enclosed flaring systems for some of the most challengingupstream gas compositions. By combining advanced combustion design, in-houseengineering validation, and fully integrated manufacturing, CRA providedSchlumberger and Cairn with a robust, compliant, and repeatable solution forlean and contaminated produced gas. The Barmer installation reinforces CRA’s expertise in turnkey flaring systems where combustion stability, safety, andreliability are critical under difficult operating conditions.