Overview

Off-spec CBG plants brought back to specification

CRA audits CBG gas trains, finds where gas quality and methane are lost, and retrofits the scrubbing, drying and polishing stages that bring the plant back to specification.

Scope

Audit, design and retrofit

Common fixes

H₂S, moisture and pressure

Product gas target

IS 16087:2025

Work

At operating plants

Technology Explained

How does a CBG plant retrofit work?

The retrofit starts with the data: raw gas analyses, product gas quality and operating records. CRA checks each stage of the gas train against what the next stage needs. The usual findings are H₂S breaking through, wet gas reaching the membranes, unstable compressor suction or air entering with a biological scrubber. CRA then designs and supplies the stages that fix them.

How it works

Retrofit skids tie into the existing gas train at the points the audit identifies.

1
Data reviewed

Gas analyses and operating records show where quality is lost.

2
Stages audited

Each stage is checked against what the next stage needs.

3
Fix designed

CRA designs the scrubbing, drying or polishing the plant needs.

4
Retrofit installed

Skids tie into the existing gas train with short downtime.

5
Quality verified

Product gas analyses confirm the improvement.

Key Benefits

1
Root Cause Found

CRA audits the gas train stage by stage to find where quality is lost.

2
Gas Back on Specification

Retrofits target the CBG quality that IS 16087:2025 requires.

3
Less Methane Slip

Stable inlet gas helps the membranes recover more methane.

4
Longer Membrane Life

Clean, dry, steady gas protects the membranes.

5
Work at Operating Plants

Retrofit skids are designed for installation at running plants.

Projects That Push Boundaries

See all Case Studies
Wastewater & Landfill
Chemical Scrubber with Biological Regeneration and Activated-Media Polishing for a Municipal STP
Confidential
Mumbai, Maharashtra, India

Chemical scrubber with biological regeneration and activated-media polishing designed to reduce H2S from 10,000 ppm to below 200 ppm.

1,275

Nm³/hr

10,000 ppm

H2S In

<200 ppm

H2S Out
Read case study
Biogas
Wet H2S Scrubber for CBG Biogas Upgrading in Kerala
CBG Plant, Kerala
Kerala, India

Removes H₂S from Biogas stream using a wet scrubber, engineered for CBG Application.

971 Nm³/hr

Capacity

~250 ppm

Inlet H₂S

Wet scrubber

System Type
Read case study
See All Case Studies

The CRA Edge

Proven Expertise

CRA has more than 30 years of experience in gas handling and flare engineering.

In-House Strength

Design, R&D and manufacturing are carried out under one roof.

Global Compliance

ISO 9001 certified through TÜV NORD, with designs aligned with ASME, API and CE.

Tailored Solutions

Designs are customised to the process needs and the regulations that apply at site.

Applications

Off-spec CBG
High methane slip
Oxygen in product gas
Plants below design output
H₂S breakthrough
Wet gas problems
Membrane damage
Scrubber replacement
ENGINEER'S TOOLKIT

Built to help you specify.

Sizing tools, decision guides, and technical references. Use them before, during, and after your evaluation.

Our Resources

Get all the technical details and resources you need in one place.

Tecnical Datasheet
Download
Tecnical Datasheet
Download
Tecnical Datasheet
Download
Tecnical Datasheet
Download

Frequently Asked Questions

Get all the technical details and resources you need in one place.

No items found.

Frequently Asked Questions

Why do CBG plants go off-spec?

Most quality problems start upstream of the membranes: H₂S breakthrough, moisture, unstable pressure or air added by the scrubber.

What does a CRA retrofit cover?

It starts with an audit of the gas train, followed by upgrades to the stages that need them, such as bulk desulphurisation, drying and polishing.

Why can a biological scrubber cause off-spec CBG?

Biological scrubbers dose air into the gas, which puts oxygen and nitrogen into the CBG. CRA uses the chemical scrubber with biological regeneration for CBG duty.

What data does CRA need to start?

CRA needs the raw gas data, the product gas analyses, the plant's operating records and the specification it has to meet.

Can the plant keep running during the retrofit?

CRA plans retrofit skids for installation at operating plants and works with the plant to keep downtime short.

Custom engineered. Properly scoped.

Speak to an engineer