Mobile Flares for Well Testing

Trailer and skid-mounted flares that move between wells for testing, clean-up and workover flaring.

Mobile Flares for Well Testing
Quick Enquiry
Talk to an engineer about your project.
Send us your requirements and we will get back within 2 business days
Interested in : 
Mobile Flares for Well Testing
Your request has been received. A technical specialist will connect with you shortly.
Oops! Something went wrong while submitting the form.
Overview

Temporary flaring that travels with the crew

CRA's portable and mobile flares give well testing and workover crews a supervised flame at sites with no permanent flare, and move on to the next well when the job is done.

Destruction efficiency

>98%

Mount

Trailer or skid

Site connection

Flexible hose or quick-connect

Standard

API 537

Technology Explained

Why use a mobile flare for well testing?

During a well test the gas from the well is measured and then has to be disposed of safely. A permanent flare makes little sense for a test that lasts a few days. A mobile flare brings the flare to the well on a trailer or skid, connects to the test separator and burns the gas under supervision.

How it works

The flare connects downstream of the test separator through a flexible hose or quick-connect fitting.

1
Flare delivered

The flare arrives at the well on its trailer or skid.

2
Connected

A flexible hose or quick-connect fitting links the flare to the test separator.

3
Pilots lit

The flare's own ignition system lights and proves the pilots.

4
Gas burned

Test gas is burned at the flare while the well is measured.

5
Moved on

When the test ends, the flare is disconnected and moved to the next site.

Key Benefits

1
Moves with the Job

Trailer or skid mounting lets the flare travel from well to well.

2
Quick Hook-Up

Flexible hoses and quick-connect fittings shorten set-up at each site.

3
Self-Contained

Pilots, ignition and controls travel with the flare.

4
Over 98% Destruction

The flare is designed to destroy more than 98% of the hydrocarbons in the test gas.

5
Supervised Flame

The flare gives a controlled, supervised flame at sites with no permanent flare.

Projects That Push Boundaries

See all Case Studies
No items found.
See All Case Studies

The CRA Edge

Proven Expertise

CRA has more than 30 years of experience in gas handling and flare engineering.

In-House Strength

Design, R&D and manufacturing are carried out under one roof.

Global Compliance

ISO 9001 certified through TÜV NORD, with designs aligned with ASME, API and CE.

Tailored Solutions

Designs are customised to the process needs and the regulations that apply at site.

Applications

Well testing
Workover operations
Pipeline purging
Temporary flaring
Well clean-up
Exploration wells
Plant commissioning
Emergency standby

Our Resources

Get all the technical details and resources you need in one place.

Tecnical Datasheet
Download
Tecnical Datasheet
Download
Tecnical Datasheet
Download
Tecnical Datasheet
Download

Frequently Asked Questions

Get all the technical details and resources you need in one place.

No items found.

Frequently Asked Questions

How is a mobile flare set up at the well?

The flare arrives on its trailer or skid and connects to the test separator through a flexible hose or quick-connect fitting, which keeps set-up short.

Can one flare serve several wells?

Yes. Mobile flares are built to travel, so one unit can serve several wells in turn.

Does the flare come with its own ignition?

Yes. Each mobile flare carries its own pilots, ignition and controls.

What data does CRA need to select a flare?

CRA needs the expected gas flow and composition, the separator pressure, and the site conditions.

Is the flare bought outright?

Yes. CRA supplies mobile flares for outright purchase, so the operator keeps the unit for its own test programme.

Custom engineered. Properly scoped.

Speak to an engineer