Mobile Flares for Dumpsite Biomining

Trailer-mounted flares that destroy the landfill gas released while legacy dumpsites are biomined.

Mobile Flares for Dumpsite Biomining
Quick Enquiry
Talk to an engineer about your project.
Send us your requirements and we will get back within 2 business days
Interested in : 
Mobile Flares for Dumpsite Biomining
Your request has been received. A technical specialist will connect with you shortly.
Oops! Something went wrong while submitting the form.
Overview

Flaring that moves with dumpsite excavation

CRA's trailer and skid mounted flares destroy the landfill gas drawn from legacy dumpsites during biomining, and move with the work as the site is cleared.

Destruction efficiency

>98%

Mount

Trailer or skid

Site connection

Flexible hose or quick-connect

Standard

API 537

Technology Explained

How is a mobile flare used on a biomining site?

Temporary wells or collection points draw gas from the waste ahead of the excavation and send it to the flare. Automated pilots and flame monitoring keep the gas burning safely while the flare is connected. As the work face advances, the flare is disconnected, moved to the next collection point and connected again.

How it works

The flare arrives as one unit, with its burner, pilot, ignition panel and flow control built in.

1
Delivered

The flare arrives on site as one self-contained unit.

2
Connected

Flexible hose or quick-connect fittings join it to the gas source.

3
Running

Automated pilots and flame monitoring keep combustion safe.

4
Relocated

The flare moves as the excavation advances.

5
Returned

When the job ends, the unit is inspected before its next deployment.

Key Benefits

1
Moves With the Work

The flare can be relocated as excavation moves across the site.

2
Quick Connection

Flexible hose or quick-connect fittings join the flare to the gas source.

3
No Permanent Works

The flare needs no permanent piping or civil work at site.

4
Over 98% Destruction

The flare destroys more than 98% of the methane it burns.

5
Ready for the Next Site

Between jobs, the unit is inspected before it moves on.

Projects That Push Boundaries

See all Case Studies
Wastewater & Landfill
LFG Flare & Extraction System at Ghazipur Dumpsite, Delhi
GAIL
New Delhi, India

Enclosed flare tower and extraction system handling 600 Nm3/h of landfill gas at DRE at or above 98%, designed to CPCB stack limits.

600 Nm³/h

LFG Capacity

≥ 98%

DRE

10 m, 1.8 m Dia

Flare Tower
Read case study
See All Case Studies

The CRA Edge

Proven Expertise

CRA has more than 30 years of experience in gas handling and flare engineering.

In-House Strength

Design, R&D and manufacturing are carried out under one roof.

Global Compliance

ISO 9001 certified through TÜV NORD, with designs aligned with ASME, API and CE.

Tailored Solutions

Designs are customised to the process needs and the regulations that apply at site.

Applications

Legacy dumpsite remediation
Landfill reclamation
Odour control during excavation
Gas pumping trials
Biomining projects
Temporary gas wells
Interim flaring
Multi-site programmes

Our Resources

Get all the technical details and resources you need in one place.

Tecnical Datasheet
Download
Tecnical Datasheet
Download
Tecnical Datasheet
Download
Tecnical Datasheet
Download

Frequently Asked Questions

Get all the technical details and resources you need in one place.

No items found.

Frequently Asked Questions

Why flare landfill gas during biomining?

Legacy waste still holds landfill gas. Drawing it off and burning it while the heap is opened cuts methane and odour and lowers the risk of fire on site.

How is the mobile flare connected?

The flare connects to the gas source through flexible hose or quick-connect fittings, with no permanent piping or civil work.

Can the flare move during the project?

Yes. Built on a trailer or skid, the flare can follow the work face across the site and move to the next site when the job ends.

Is the mobile flare bought for the project?

Yes. CRA supplies the flare for outright purchase, and the same unit can move on to the next site once the job ends.

What data does CRA need for a biomining flare?

CRA needs the expected gas flow and methane content, the length of the job, the site layout and the site conditions.

Custom engineered. Properly scoped.

Speak to an engineer