Our Clients

Industry Challenges

Gas pipelines and city gas networks have to be emptied safely before maintenance, and every receiving point needs the gas measured and its pressure brought down to suit the network. The four points below are the main problems pipeline and city gas operators face.

Line Depressurisation

Gas left in a pipeline section has to be burned safely before work can start on it.

Remote Work Sites

Maintenance often happens far from any fixed flare, so the flare has to travel to the site.

Accurate Measurement

Gas handed over between parties has to be measured accurately at every transfer point.

Steady Delivery Pressure

Downstream users need a steady pressure whatever the flow and the upstream pressure.

The CRA Edge

CRA builds mobile flares and gas skids for pipeline and city gas operators in its own factories, with ignition and controls built into each unit.

Trailer-Mounted Flares

Mobile flares travel to the work site on a road trailer.

Self-Contained Units

Ignition and controls are built into the mobile flare.

Metering Skids

Metering skids measure gas at transfer and receiving points.

Pressure Regulation

Pressure regulating skids hold a steady outlet pressure for the network.

Our Clients

Projects That Push Boundaries

See how we turn hard problems into high-performance infrastructure.

See all case studies
See All Case Studies

Proven. Respected. Relied On.

Unfiltered feedback from companies solving real-world infrastructure challenges.

No items found.

Related Blogs

Get all the technical details and resources you need in one place.

No items found.

Frequently Asked Questions

Get all the technical details and resources you need in one place.

No items found.